Brought forward,

6,673,600

729,000

6,485,550

1,540,950

Voto.

Estimated Saving.

Now Required. 1924.

Estimated

Excess.

$

*

$

Brought formed,

6,341,600

826,000

7,168,900

1,658,800

BUILDING,-Continued.

120 Cheung Chan School,

1,000

1,000

121 Un Long School,

1,000

1,000

122 Public Latrines, Urinals and Bath-

bouses,

15,000

15,000

MISCELLANEOUS.

126 Further Reclamation: at Shamshuipo,

150,000

25,000

125,000

127 Kaulungtong Development Scheine :-

F. M. No. 30..

25,000

(4) Resumption,

60,000

25,000

10,000

COMMUNICATIONS.

123 Ronds-

(a.) Metalling and tur paiuting hilly portion of Lai Chi Kök-Castle Peak and Taipe Roads,

(6) Excavation and filling,

128 Construction of Waterbout Dock at Lai

Chi Kok,.....

100,000

100,000

100,000

20,000

80,000

30,000

129 Refuse Dump,-Cheung Sha Wan, 130 Furniture for Government Offices and

Quarters...

1,000

1,000

3,500

3,500

(b) Taipo Market, kerbing and chan-

nelling, &c..

30,000

151 Chinese Cemeteries,-Laying out now

areas,

5,000

5,000

2,000

2.000

(e.) Taipo Road, Widening and in-

132 Kowloon Bay East Reclamation, forma-

proving from 5th milestone to Shatin,...

1,000

tion of Junk buikling and repairing yards,

50,000

50,000

(2) Widening eleven bridges, (e.) Surfacing and strengthening those portions of main road running through paddy,

10,000

9,000-

10,000

40,000

30,000

133 Opening up of Quarry, Castle Peak, 184 Miscellaneous Works,

5,000

10,000

5,000

15,000

15,000

30,000:

Extension of Roads in Kaulung- tong Developmen! Arca. (9.) Access Road from Tsün-way to the proposed Water Works an Shing Man Valley,

(4.) Waterloo Road extension (300 feet wide) Section between Kowloon Boudary to foot of bills S., of Tunnel (estimate for 50 foot wilth),.. (4) Fanling to Sha-tan-kok Road,

General Works,

DRAINAGE.

124 Training Nullahs:-

(a.) One side wall and invert of unilal

30,000

20,000

20,000

100,000

10,000

90,000

F. M. No. 11,.

135 Compensation and Resumptions,

PUBLIC HEALTH AND BUILDINGS ORDINANCE, 1903.

20,000 20,000

50,000

20,000

WATER WORKS,

.....

5.000 160,000 30,000

60,000

10,000 100,000

5,000

49,350

19,350

136 Extension of Kowloon Catchwater, 137 Shing Mun Valley Sehome....

120,000 100,000

120.000

4.

50,000

50,000

138 Shek Lai Pai, Reservoir and Contingent

Works,

200,000

100,000

139 Fauling Water Works Scheme,

7,000

100,000 7,000

on Eastern side of the Kaulingtong Development Scheme,

50,000

66,000

16,000

(6.) Kanlungtong Development Area, connection of stream North of this area to main tulleb,

50,000

50,000

(e) Shamshuipo, extension of existing

Nanchang Street Nullah to Taipo link.

20,000

20,000

(d) General Works,

3,000

5,000

125 Miscellaneous Drainage Works :-

(4.) Maiu sewer from Fuk Ten Henng in a North-easterly direction to Taipo Road,

25,000

10,000

15,000

(6) Storm water dmins from Nan Chang Street Nallah in the diree- tion of Kanlungtong Village, (c) Kaulungtong Development Schome,

Sewers,.

15,000

15,000

25,000

25,000

(d.) Kaulungtong Development Scheme, portion of Storm Water draios,................ (e) General Works,

50,000

50,000

20,000

53,000

$3,000

Carried forward,

6,341,600

826,000

7,168,900

1,658,300

Total,..

7,270,100 1,021,000

7,952,400

1,703,300